|

Mercury Marine Breaks Ground on New Industrial Design Studio to Advance Innovation, Collaboration and Community Investment 

April 28, 2026

Mercury Marine, a division of Brunswick Corporation (NYSE: BC) and a global leader in marine propulsion, today held a groundbreaking ceremony for its new Industrial Design Studio, marking a significant investment in the future of product design, innovation, and collaboration. 

The new approximately 18,000‑square‑foot, two-story, state-of-the-art facility is designed to support modern design and development and reflects Mercury Marine’s long-term commitment to investing in its people, processes, and innovation pipeline. The new studio brings the team together in a single, integrated environment designed to improve efficiency and foster creativity. 

“Today’s groundbreaking represents an exciting advancement in how we design, collaborate, and innovate,” said John Buelow, president of Mercury Marine. “We are passionate about continuing to enhance the boating experience of customers worldwide. Uniting our Industrial Design team in one location will boost our team’s creativity, safeguard innovation, and empower us to keep providing outstanding experiences for our customers. 

The Industrial Design Studio will feature advanced capabilities that support the full design process, including an advanced visualization area, a modelmaking lab, a user experience lab, and future clay‑modeling capabilities. The facility will also include controlled access entry for employees and guests, second floor offices, conference rooms, and project spaces, along with capacity for future expansion as Mercury Marine’s design needs continue to evolve. 

Beyond strengthening Mercury Marine’s internal capabilities, the new Industrial Design Studio represents an investment in the Fond du Lac community, reinforcing the company’s long-standing presence and commitment to the region. By expanding high skill design and engineering operations locally, Mercury Marine continues to support job growth, attract top talent to the area, and contribute to a strong, innovation driven local economy. 

Construction of the Industrial Design Studio is expected to be completed by January 2027. 

Related Posts




Good Advice that You Can Share – Falling Overboard Recovery Steps

By John Gullick
 
An accident that occurs with surprising frequency to passengers and crew is falling. The chance of this happening can be greatly reduced if precautions are taken, such as wearing non-skid shoes that lace up and wearing appropriate clothing that does not impede movement. Those on board should make sure they have a sound footing and a good handhold at all times. Here is an old saying to remember: “Sailors were given two hands, one for the ship and one for themselves.” 

Read More




Need to Catch up on News This Week?

Every Tuesday we publish a fresh Digest with informative articles pertaining to the Canadian boating and marine industry. Stay up to date with the latest products, research and industry developments.

Missed an Issue of Boating Industry Canada News Week? If you’re looking for a specific issue, or simply want to catch up on previous issues, check out our Boating Industry Canada News Week Archives.

Not signed up for News Week? Subscribe here.



Lund Boats Introduces New 2027 HG Pro Series, Combining Hardtop Protection with Big-Water Capability 

All-new 220 HG Pro and 240 HG Pro models deliver rugged heavy-gauge construction, enclosed hardtop comfort and serious fishing functionality for demanding open-water anglers. 

Lund Boats has unveiled the all-new Model Year 2027 HG Pro Series, a purpose-built heavy-gauge aluminum platform designed for anglers who pursue big-water fisheries in changing conditions. 

Read More


JBL Debuts the Flip 7 Magnet for Secure Portable Sound on the Water and Beyond

JBL has announced the Flip 7 Magnet, a flexible mounting solution that brings portable JBL Pro Sound to boats, golf carts, RVs, powersports, vehicles and more. The purpose-built magnetic accessory securely holds the best-selling JBL Flip 7 on compatible metal surfaces, while an included receiver plate extends placement to nonmagnetic surfaces. 

Read More