NIAGARA PARKS MARINA ENHANCEMENT PLANS: INTERESTED PARTIES INVITED TO RESPOND TO NIAGARA PARKS MARINA REQUEST FOR INFORMATION

Niagara Parks Marina

 

The Niagara Parks Commission (NPC) continues to move forward with its plans to enhance and improve the overall operations of its Niagara Parks Marina.

Following a well-attended public information session conducted on Thursday October 29, a formal Request for Information (RFI) has now been issued by the Commission.  The purpose of the RFI is to both provide and gather information to determine third party interest in NPC’s marina plans to provide a water-based destination that would strengthen the visitor and tourist experience along the South Niagara Parkway.

The RFI will gather information on three enhancement scenarios envisioned by the Commission:

•         Scenario A – Seeks to rehabilitate the current marina amenities through a multi-phased plan that is operated by a third party;
•         Scenario B – Envisions the maximization of boating recreation at the site with a new high quality marina facility that meets market potential in quantity, capacity and revenue, while also providing significant publicly-accessible activities (pier, fishing as an example) and amenities (food and beverage) through a third party capital investment and operation;
•         Scenario C – Builds on the marina facility of Scenario B and is also augmented by additional marina and public shoreline area enhancements, which integrate the entire NPC lands assembled as part of the project, to create a recreational resort through third party capital investments and operation;

Respondent submissions may address more than one scenario and propose an alternate enhancement, so long as it is in alignment with the project principles and Commission objectives that any future marina redevelopment: maximize water-based recreation and related amenities; enhance public access and activities along the Niagara River shoreline; conform to planning policy and regulations by following good planning principles; and ensure NPC’s financial sustainability, all while providing community benefit.

The RFI will: determine the corporate interest to undertake one of the scenarios; gain understanding of the skill sets of respondents and help inform NPC’s decision process to advance a preferred scenario. Those corporations interested in obtaining the RFI can do so at http://www.niagaraparks.com. 

On Thursday, October 29, 2015, NPC held a public information session at Old Fort Erie to receive input on these three proposed scenarios. The agenda for the evening included a presentation and opportunity for break out discussion groups. Feedback from this community consultation, combined with that received from the RFI will then help guide NPC in its decision towards a preferred enhancement scenario that will be shared with the public in February 2016.

As the RFI is only to gather information at this time, it is anticipated that a future Request for Qualification and Request for Proposals will be issued by NPC in 2016, to advance a preferred scenario.

Ultimately, NPC’s vision for the marina and its associated lands, is to create a regionally unique, recreation destination, which is appropriate to the Parkway and its historical river setting. This vision is based on the establishment of an exceptional public marina facility that will be developed in an economically and environmentally sustainable manner. It will also provide easy and convenient access to all the attractions along the Niagara Parkway.

This destination facility will: reinforce The Niagara Parks Commission brand; maintain the pre-eminence of the Niagara Parkway; serve the boating and recreational community across the international Niagara region; and, ensure a great experience for all patrons, tourists and visitors.

 

Related Posts




Good Advice that You Can Share – Falling Overboard Recovery Steps

By John Gullick
 
An accident that occurs with surprising frequency to passengers and crew is falling. The chance of this happening can be greatly reduced if precautions are taken, such as wearing non-skid shoes that lace up and wearing appropriate clothing that does not impede movement. Those on board should make sure they have a sound footing and a good handhold at all times. Here is an old saying to remember: “Sailors were given two hands, one for the ship and one for themselves.” 

Read More




Need to Catch up on News This Week?

Every Tuesday we publish a fresh Digest with informative articles pertaining to the Canadian boating and marine industry. Stay up to date with the latest products, research and industry developments.

Missed an Issue of Boating Industry Canada News Week? If you’re looking for a specific issue, or simply want to catch up on previous issues, check out our Boating Industry Canada News Week Archives.

Not signed up for News Week? Subscribe here.



Lund Boats Introduces New 2027 HG Pro Series, Combining Hardtop Protection with Big-Water Capability 

All-new 220 HG Pro and 240 HG Pro models deliver rugged heavy-gauge construction, enclosed hardtop comfort and serious fishing functionality for demanding open-water anglers. 

Lund Boats has unveiled the all-new Model Year 2027 HG Pro Series, a purpose-built heavy-gauge aluminum platform designed for anglers who pursue big-water fisheries in changing conditions. 

Read More


JBL Debuts the Flip 7 Magnet for Secure Portable Sound on the Water and Beyond

JBL has announced the Flip 7 Magnet, a flexible mounting solution that brings portable JBL Pro Sound to boats, golf carts, RVs, powersports, vehicles and more. The purpose-built magnetic accessory securely holds the best-selling JBL Flip 7 on compatible metal surfaces, while an included receiver plate extends placement to nonmagnetic surfaces. 

Read More