YOU HAVE A PUBLIC COMMENT OPPORTUNITY ON THE GREATLAKES WATER LEVEL STUDY

 

 

The International Upper Great Lakes Study (IUGLS) is holding public meetings this summer in the United States and Canada to provide information regarding the status of the second and final phase of its work, examining Great Lakes water levels. Those who attend the meetings will have an opportunity to hear from Study Board members and researchers about preliminary findings and potential regulation plans. Those who are unable to attend, or have further comments, can submit them via a form on the IUGLS website, and by e-mail or via traditional mail. The comment period for this Phase 2 portion of the Study begins Monday, July 18, and ends Wednesday, August 31, 2011.

A list of meetings in the U.S. and Canada follows, along with information on what will be presented, how to download copies of a Progress Report that will be handed out, and how to submit formal comments. A full map, with meeting locations, dates and times is available at www.iugls.org .

In the United States, public meetings will be completed in the next two weeks ending August 9th at the Yellowjacket Union (www.uwsuper.edu/yu) on the campus of the University of Wisconsin-Superior.

In Canada, the public meetings are just starting and will be held at six locations in Ontario:

    Aug. 2, from 7-9 p.m. at Lambton College (www.lambton.on.ca ), Room A223, 1457 London Road, in Sarnia;

    Aug. 3, from 7-9 p.m. at the Royal Canadian Legion (www.legion.ca ), Normandy Room, 490 Ontario St., in Collingwood;

    Aug. 4, from 7-9 p.m. at the Royal Canadian Legion, 196 Queen St., in Midland;

    Aug. 6, from 10 a.m. to noon at the Park Center, Main Hall, 39 Henry Drive, in Kagawong (Manitoulin Island);

    Aug. 10, from 7-9 p.m. at Lakehead University (www.lakeheadu.ca ), ATAC Room, 955 Oliver Road, in Thunder Bay; and,

    Aug. 11, from 7-9 p.m. at Algoma University (www.algomau.ca ), Great West Life Theatre, 1520 Queen Street East, in Sault Ste. Marie.

During the meetings in the U.S. and Canada, overview presentations will be given regarding Phase 2 of the Study. Topics to be covered include:

    The potential to improve the regulation plan for Lake Superior outflows at Sault Ste. Marie;

    The need for ongoing monitoring to allow for adaptive management;

    An exploratory analysis of restoration scenarios for Lake Michigan-Huron water levels;

    New data on potential climate change impacts for the Great Lakes;

    A discussion of the ongoing impacts of Glacial Isostatic Adjustment; and,

    Multi-lake regulation options.

You can download a copy of a Progress Report that addresses these issues at www.iugls.org/Docs/progress_report_summer_2011_final.pdf

You can download a copy of a Public Meeting Presentation at www.iugls.org/Docs/public-presentation/272/book.html

The comment form is available online at www.iugls.org/comment.asp.

Comments can also be sent by e-mail to info@iugls.org . Please indicate “Phase 2 comments” in the subject line of your e-mail.

Comments can be sent via traditional mail to (In Canada):

 

International Upper Great Lakes Study

234 Laurier Avenue West, 22nd Floor

Ottawa, Ontario K1P 6K6

 

Or, in the U.S.:

 

International Upper Great Lakes Study

P.O. Box 32869

Detroit, MI 48232

 

Please also indicate “Phase 2 comments” at the top of your letter.

The Study Board is working with a Public Interest Advisory Group (PIAG) to bring a wide range of perspectives to the study process, including those of shoreline property owners, boaters, anglers, governments, Native Americans, First Nations, hydroelectric power producers, and environmental and shipping organizations.

Input received at the public meetings and during the public comment period will help inform the drafting of a final, peer-reviewed Phase 2 report to be submitted to the International Joint Commission (IJC) in March 2012. After that time, the IJC may hold its own public consultation on the Phase 2 report before making any recommendations to the U.S. and Canadian governments.

 

Related Posts





Princecraft Boats upgrade their facilities with an investment of over $4 million for the addition of a powder coating line

CMRA

Princecraft boats on April 17, 2024, announced to their employees, a major investment in one of their three Princeville plants, which will include the installation of high-tech powder coating capabilities. The nearly $4 million upgrade marks the largest investment in Princecraft facilities since the early 2000s and will improve operational efficiency, product quality and better poise the company for response to demand.

Read More




Need to Catch up on News This Week?

Every Tuesday we publish a fresh Digest with informative articles pertaining to the Canadian boating and marine industry. Stay up to date with the latest products, research and industry developments.

Missed an Issue of Boating Industry Canada News Week? If you’re looking for a specific issue, or simply want to catch up on previous issues, check out our Boating Industry Canada News Week Archives.

Not signed up for News Week? Subscribe here.



The Hydrobike, a key concept that embodies a vision for the future

DECATHLON, determined to erase the boundary between land and water, introduces its latest forward-thinking concept: the HydroBike. This innovation from the French sports giant aims to democratize access to nature while staying ahead in the transformation of their business model. 

The initial assessment: paddle sports are often inaccessible to less experienced individuals, assuming the acquisition of paddling skills.

Read More


ACR Electronics emergency beacons are designed with one purpose: to save lives.

Hubbell-Marine Stainless steel outlet covers

An all-encompassing and dependable set of vital resources, ACR GlobalFix V5 AIS RLS EPIRB Survival Kits ensure security and survival in waterborne emergencies. The most advanced EPIRB (Emergency Position Indicating Radio Beacon) available, the ACR GlobalFix V5 EPIRB combines 406 MHz satellite connectivity with Automatic Identification System (AIS) functionality.

Read More