NEW CONSTRUCTION OF THE BOLSOVER DAM AT LOCK 37 ON THE TRENT-SEVERN

Dam Lock 37

 

Mar 12, 2016 

Parks Canada is pleased to provide an update on our work to replace the Bolsover water control dam at Lock 37 in the City of Kawartha Lakes.

The construction of the new dam is complete and the upstream and downstream cofferdams have been removed. Parks Canada staff have been onsite this week to gradually begin the flow of water through one of the spillways. In order to protect fish spawning areas downstream of the dam, an environmental plan was put into place that would reduce disturbance in the water. Throughout the process of gradually opening a spillway, a Parks Canada environmental team has been onsite providing monitoring and conducting tests.

Once the dam is deemed to be fully operational, it will be set to normal winter settings and steps will be taken to remove the temporary water diversion system at the site. Boat navigation will continue as normal when the 2016 navigation season begins on May 20, however the lock grounds will remain closed to the public while they are being restored. It is anticipated the site at Lock 37 will be completely restored by Fall 2016, and fully open to the public in the 2017 season.

Water retaining structures, like the Bolsover Dam at Lock 37, play an integral role in the management of water levels of the Trent-Severn Waterway, and in the safety of residents and visitors in this area.

The Government of Canada has made unprecedented investments into rehabilitating Parks Canada’s assets and infrastructure. When the replacement of the Bolsover Dam at Lock 37 was announced in 2013, this project was the largest construction project that Parks Canada had undertaken in Eastern Canada in 25 years.

For up-to-date news on infrastructure work along the Trent Severn Waterway, please visit www.pc.gc.ca/trent or e-mail Ont.TrentSevern@pc.gc.ca.

 

Related Posts





Princecraft Boats upgrade their facilities with an investment of over $4 million for the addition of a powder coating line

CMRA

Princecraft boats on April 17, 2024, announced to their employees, a major investment in one of their three Princeville plants, which will include the installation of high-tech powder coating capabilities. The nearly $4 million upgrade marks the largest investment in Princecraft facilities since the early 2000s and will improve operational efficiency, product quality and better poise the company for response to demand.

Read More




Need to Catch up on News This Week?

Every Tuesday we publish a fresh Digest with informative articles pertaining to the Canadian boating and marine industry. Stay up to date with the latest products, research and industry developments.

Missed an Issue of Boating Industry Canada News Week? If you’re looking for a specific issue, or simply want to catch up on previous issues, check out our Boating Industry Canada News Week Archives.

Not signed up for News Week? Subscribe here.



The Hydrobike, a key concept that embodies a vision for the future

DECATHLON, determined to erase the boundary between land and water, introduces its latest forward-thinking concept: the HydroBike. This innovation from the French sports giant aims to democratize access to nature while staying ahead in the transformation of their business model. 

The initial assessment: paddle sports are often inaccessible to less experienced individuals, assuming the acquisition of paddling skills.

Read More


ACR Electronics emergency beacons are designed with one purpose: to save lives.

Hubbell-Marine Stainless steel outlet covers

An all-encompassing and dependable set of vital resources, ACR GlobalFix V5 AIS RLS EPIRB Survival Kits ensure security and survival in waterborne emergencies. The most advanced EPIRB (Emergency Position Indicating Radio Beacon) available, the ACR GlobalFix V5 EPIRB combines 406 MHz satellite connectivity with Automatic Identification System (AIS) functionality.

Read More